Discussion on Mantri Navaratna

(requires
| Share
# Project Details
The project "Navaratna" by Mantri is located at Chromepet, Chennai. The residential units are to come up in 9 blocks.
The units are available in 510 to 1180 SQFT size. The total rate will be around 23 and above (Lakhs of Rupees)**.

There are no known Online Communities (Groups/Portals) for Owners of Mantri Navaratna.

This Map of Mantri Navaratna shows the approximate location of the project.

Other details :
Amenities include :
* Gymnasium
* Office Room
* Landscaped Garden
* Children play area
* Paved garden walk
* Jogging / Walking Trail
* Basket Ball post
* Outdoor Exercise Area
* Toilets at Ground Floor for servants, drivers & workers.
* Round the clock security
* Telephone with Intercom Facility
* Back Up Generator
* Standby generator for lights in common areas, lifts and pumps.
* Water Treatment Plant
* Rain Water Harvesting
* Sewerage Treatment Plant

Distances from Major Landmarks
SSM Matriculation School - 2 km
Balaji Medical College & Hospital - 1 km
Hilton Matriculation School - 2 km
Vaishnavi Arts & Science Womens College - 2.75 km
Chromepet Bus Stand - 1 km
Vetri Theatre - 1.5 km
Chromepet Police Station - 1 km
MEPZ ( Madras Export Processing Zone) - 2 km
Airport - 3 km
Chromepet Railway Station - 1 km
Tambaram - 1.5 km
Karaikudi Restaurant - 0.5 km
A2B - 0.5 km
Tiruneemalai Main Road - 0.5km


Also on offer : Holiday in Dubai for those who book their apartments from 12th Feb, 2011 to 20th Feb 2011. Call 1800-121-0000 for details.


Images :(Click to view larger image)
Photo - Mantri Navaratna Photos Photo - Mantri Navaratna Landscape Plan Photo - Mantri Navaratna Location Map



Project Webpage : Mantri - Navaratna details

Related : Buses / Trains connecting Chromepet
** Not Yet Verified by builder. Details..
 

# r.rajkumar   Post Subject:Discussion on Mantri NavaratnaSat Feb 12, 2011 10:06 AM
Discuss about Mantri Navaratna project in this thread

# arunalexjohn   Post Subject:Discussion on Mantri NavaratnaSat Mar 12, 2011 11:17 AM
has anyone seen the site where it will be constructed?
Last-Updated by : arunalexjohn on Sun Mar 20, 2011 05:37 AM

# cjsudha   Post Subject:Discussion on Mantri NavaratnaThu May 05, 2011 11:06 AM
Hello every body,

My humble request... Do not trust Mantri Builders. They are cheating people.

I bought a house in Mantri synergy 2 in 2009 August.

But till now i didnt get a key. They are postponing the possession date of flat.

Quality is worst.

Please dont believe them..

Dont buy...



# krpadmanaban1965   Post Subject:Discussion on Mantri NavaratnaThu Jun 09, 2011 06:03 AM
Why no answer for the previous complaints ? It is good in banglore why not in chennai... answer properly then we will think for booking

# guruindia101   Post Subject:Mantri Navaratna AgreementThu Nov 24, 2011 08:38 AM
Hi to everybody ! I have recently booked a flat with Mantri Navaratna, Chennai. They recently sent the sale and construction agreement to be signed. But we are surprised to note that (a) There is NO mentioning about UDS (b) the names of the buyer i.e. our names are only mentioned in annexure. Upon asking Mantri claims it is their procedure and they would mention the UDS only during registration (but there is no hold for the buyer - am I right/). None of my relatives and friends have seen something like this while buying a flat. If any of you have experienced with Mantri, could you please comment on this? As we are investing huge money by borrowing loan as everybody else does, your advice would be helpful. Thanks.

# senddocumentstnj   Post Subject:Discussion on Mantri NavaratnaWed Jan 04, 2012 11:25 AM
hi guruindia101, I too also booked a flat on Mantri Navaratna, I noticed they have furnished the details of UDS in the annexure.

# mantrinavaratna   Post Subject:Discussion on Mantri NavaratnaWed Jan 04, 2012 12:29 PM
yes, the UDS value is furnished on the Annexure and they stated the completion date on March 15, 2013.

# ksuhail80   Post Subject:Discussion on Mantri NavaratnaThu Jan 26, 2012 03:08 PM
hello all,

I'm planning to buy one flat at mantri navaratna........any idea about the latest price per sq ft....they are quoting 3990....do you think this is worth



# rmatrubutham   Post Subject:Discussion on Mantri NavaratnaTue Aug 07, 2012 11:16 AM
I read the brochure on Mantri-navaratna.no mention about water availability,arrangement of drinking water,whether 24hr supply etc,Also distances from GSTRoad,A2B restaurant seems to be ridiculously understated.It must be more than 3KM-I think

# gnanasekaran.n   Post Subject:Poor Security measure in the LiftTue Nov 27, 2012 11:48 AM
I am a resident in Mantri Synergy (previous project of Mantri Developers in chennai). The lift is not having a very basic safety mechanism that when power goes off, it doesn't go on to the nearest floor to open it up. If power goes off people will be stuck and if there is no electrician to do the switch over to the DG power.. that is stay there in the dark and if you are lucky to survive then some one will come and open the door for you... Staying in 8th floor there is no option other than using the lift... Very basic security feature is not there in the lift of this so called "HI-TECH" apartment. Frustrated living here.

Mantri developers are not doing a quality job in Chennai.

# twinuser2013   Post Subject:Discussion on Mantri NavaratnaSun Jan 13, 2013 07:57 PM
Hi guruindia101 and senddocumentstnj,
I too booked an apartment in Mantri Navaratna. I was also surprised to know that my name was mentioned on the Annexure only and not on the main document. I still do not see the UDS details on the annexure. Where do you see it? I only see the Super Bulit-up Area sq.ft details.
I do see the completion date as 15-Mar-2013. But are they on schedule to deliver by Mar 2013?
I have already paid 90% of payment. The payment schedule says to pay the remaining 10% only during handover/possession. But I was recently asked to make the remaining 10% payment too (even though they are not ready for possession) and proceed with the registration process. When asked to clarify, they say it was an instruction from the head office. Even for the first 90% I was hesistant to pay because other developers ask only 20% as initial payment and remaining 80% after completion or during hand-over. But Mantri seems to collect all money before hand. I had no option since they said I will end us paying penalty for not paying on time. Have you guys or other buyers have the same experience? I think Mantri should change their policy and stick to the agreement document on both payment schedule and deliver. If every buyer joins hands and objects to pay 100% before they hand-over, I think Mantri will think about this. I'm not going to pay the remaining 10% unless it is completely ready for possession. What do you buyers think?

# twinuser2013   Post Subject:Discussion on Mantri NavaratnaSun Jan 13, 2013 08:01 PM
cjsudha,
I'm scared after reading your comments. What was their original "planned" completion date (as per your agreement document) and when did they finally hand-over? I'm reading reviews from other buyers that many have started selling their apartment in Synergy. Are there any other issues?

# mantrinavaratna   Post Subject:Discussion on Mantri NavaratnaThu Jan 17, 2013 02:03 AM
Hi twinuser2013,
I too booked a flat in Mantri Navaratna, they have intimated to pay the remaining amount, but it's our wish to make the payment, we can pay the amount at the time of possesion no need to pay in advance, the only doubt is, they have mentioned that the registration will happen after disbursing the remaining amount, but bank persons said the bank disburse the final amount once registration get completed:), this should get clarified with the Mantri CRM team, the project is expect to get complete by june2013.

# twinuser2013   Post Subject:Discussion on Mantri NavaratnaFri Feb 01, 2013 01:43 AM
Hi mantrinavaratna,
Thank you for your reply. I first thought you are a representative of Mantri developers because your username sounded like that. Good to know that you are a buyer.
I will check with Mantri if it is optional to pay the remaining 10% now. But they are calling all owners for registration (atleast all A block owners that I know of). So if I have to go for registration, I have to pay the remaining 10%. As I mentioned earlier, I and my bank already paid 90%. My bank is ready to pay the remaining 10% but just waiting for my approval. I'm not going to ask my bank to disburse the remaining 10% until construction is completed and ready for possession.
My friend who is another buyer recently went to look at the apartment. He says only A block seems to be completed and there are still more interior work to be done in A block. Initially, Mantri said they are going to complete all 9 blocks in parallel and handover all the apartments at the same time. The reason they stated is that they do not want to release 1 block at a time and have residents occupying while other blocks are under construction. At this point, I don't think they will meet their deadlines. Does anyone know if they will pay us interest for all the months they delay?
Btw, do you see the UDS details in the annexure in your agreement document? I only see the Super Bulit-up Area sq.ft details.

# mantrinavaratna   Post Subject:Discussion on Mantri NavaratnaSat Mar 09, 2013 04:05 AM
Hi twinuser2013
Sorry for the late reply:)

Yes, as you said the remaining amount of our own contribution to be paid prior to the registration, its good as you mentioned to disburse the balance amount on the project completion.

Do you have any idea on the exact completion date of the project, have you received any written statement or mail regarding the project delay?, as per the agreement the project completion date is March 15 2013, but till now there is no official announcement to the user regarding the project delay, because they didn't want this to be recorded.

Regarding project delay we need to ask them as a statement than only we can able to ask for the project delay compensation. May I know in which block you have booked your home? if you wish mail to (mantrinavaratna@gmail.com).

# amiteshbabu   Post Subject:Discussion on Mantri NavaratnaSat Apr 27, 2013 08:47 AM
Hello owners of mantri navratna,
As per their schedule to completion date is 15 march 2013, but they are delay due to their STP work, Now they are telling to handover the apartments in July2013. All the owners should ask them to the delay in projects. Many of the owners start paying their EMI without getting the flats..... This is very bad situations to the owners....But Mantri never cares about the owners feelings and their Huge Investments..... they wants to make money.............for their business.............


# twinuser2013   Post Subject:Discussion on Mantri NavaratnaTue Jun 04, 2013 05:11 PM
Hello owners,
Any updates to the possession date? I heard that there is further delay and they are now planning to handover in Aug/Sep 2013. I'm assuming when we get to Aug/Sep, they will once again push to end of the year.

# mantrinavaratna   Post Subject:Discussion on Mantri NavaratnaSat Jun 08, 2013 08:43 AM
Hi twinuser2013 and all owners,

MANTRI saying now the possession date is on October 2013(I had mail from Mr.Jeyakannan after long struggle), mentioning that they will allow the users to start their Interior works and house warming ceremony by July if only they have registered and the possession date is postponed to October, I didn't believe them on this, for sure they will postponed further.
Hope we need to join hands and demand them to get the exact completion date and the compensation for those delayed period as per the agreement.
Customer support is the worst part I faced, if you ask any clarification through mail, they wont response, you want keep on tracking and need to beg for the reply.
Even they can say it is a printing mistake in the agreement completion date is on March 15 2014 instead it was printed as March 15 2013 :-).

# alliswell7861   Post Subject:Discussion on Mantri NavaratnaWed Jul 24, 2013 03:42 PM
Hello Buyer,
I checked recently with Builder, Again it is postpone and they said that they will try to complete by Oct End…but when I keep checking the status, past 4 month No development in status. I guess purposely they hold the STP. It remains in same status for past 4 months and resources are also is very limited. so I am not interest to buy flat. One of the buyer, my friend want to register the flat, he approached the bank, they have some clarification with builder and said discussion going on and refuse to release the final amount and really don’t know what kind of clarification now the bank need. I am not sure. It seems like under play. We already know, nationalized banks are unable to provide the loan to mantri items. So two or three banks which is referred by builder. Obviously we have to go to that bank because we paid 15% of amount with service tax. Within 9 months builder collected 90% of money. It is almost one and half year gone. I think they purposely postpone the possession time because we have to pay EMI for 2 to more years. As I know home loan, starting EMI have 90% percent interest and 10% percent may be principle if you are in transit EMI. If Pre-EMI 100% Interest. Within 3 years they collect I guess 60% of principle value as Interest. If you like to move the loan to nationalized bank. You principle remain same or decreased few 1 or 2 percent of principle value. If you move again in nationalized bank do the same like 90% interest and 10 % principle of EMC for 3 years, so that only banks are saying 3 years you have pre-close limited amount not allow re-paying the amount. If you stay 2 years obviously you have to continue all 20 to 25 year with them and the same time, builder may utilize the profit and hold money can have option to spend to next project. So think this may also one of reason for delay. I guess because of why the builder going with agreement instead of registration. But 100% not sure , When I read your comments and feedback.
I guess they are not ready to pay compensation for delay. If you say, It is noted in agreement,If you are 100% paid buyer then only they may plan to provide. Who are not paid 100%, they are not consider. Because you have to pay for construction and they do construction. apart, they don’t do anything. If any pending amount, considers that will be the reason of incomplete. So who are have money, please check with bank and do the registration, so that you will have option to get compensation. Please before doing, check with your bank. Because they are only have to hold the paper.
If Anyone have different directions in this… please comment. it will more useful for all flat buyers….I am looking for buying greated community flat.I don’t thing we get ready to occupy status.So Keep checking in blog feedbacks and analyzing .If anyone knows Good builders.. please recommend.


# bjeevaraj   Post Subject:Discussion on Mantri NavaratnaSat Aug 03, 2013 11:02 AM
Hi all,
When are they planning to handover the apartment? They initially advertised the handover date to be Mar-2013.
I also feel it is not advisable to pay the remaining 10% and do the registration, what is the use of it. the compensation they are going to pay is paltry(if at all they pay), will definitely be lesser than the interest which we are going to pay for the remaining 10% amount.

Just post it in all the websites and spread the news to all your friends and surrounding about Mantri, so that no body is getting cheated by these people again.
I already read many articles regarding there Synergy Apartments, which was even worse.
Last-Updated by : bjeevaraj on Wed Aug 14, 2013 04:49 AM

# appandairajs   Post Subject:Discussion on Mantri NavaratnaSun Aug 11, 2013 10:58 PM
Is it advisable to book a flat in Mantri now?? Am looking for a flat in a gated community around chrompet or pallavaram.. Currently not in India and need to move in around Jan14..

# bjeevaraj   Post Subject:Discussion on Mantri NavaratnaWed Aug 14, 2013 04:51 AM
appandairajs

Please don't buy apartment from Mantri. they are cheaters,just go through the review of Mantri-Synergy and see how people are suffering because of the delayed handover and poor quality of construction

# anupmepco   Post Subject:Discussion on Mantri NavaratnaFri Sep 06, 2013 10:01 AM
Hi Friends

Please don't buy the apartment by the name becos atlast people who buy these apartment will be struggling.
I am also a victim by buying this project.
People who are not registered will have big surprise.
1. Eventhough we are paying 1 year maintenance as advance they are also asking some caution deposit.
2. This one is useless. If your are shifting to the apartment and due to unavoidable condition if u moving to some other place within one year of shifting ...they r charging some money.

I am also amazed to see they are getting some amount for transfer of electricity meter... i am not understanding these concepts, already we have paid sufficient amount of money for electricity.

People who are going for registration please read the terms and conditions carefully.

Now they shifted the possession to Nov last week...

Thanks
Anup



# mantrinavaratna   Post Subject:Discussion on Mantri NavaratnaMon Sep 23, 2013 06:21 AM
Demanding Rs 3500 to start Interior Works:
---------------------------------------------------------------

MANTRI starts to allow the customers to start the interior works, but they are demanding an amount RS 3500 as electric charges and admin charges for interior works.
The charges are flat rate, the rates are not corresponding to the amount of electricity consumed.

If a 3BHK home is get fully furnished they need to pay Rs 3500 as well as
for 1BHK customer also need to pay the same RS 3500 even we do it for Modular kitchen alone,
they didn't have any mechanism to calculate the amount based on the usage of electricity as well as admin charges.

MANTRI still sucks cutomers. Utter Worst..,


# mantrinavaratna   Post Subject:Discussion on Mantri NavaratnaMon Nov 11, 2013 05:06 AM
Possession Date Postponed further to January 2014..,

# vkspandian4   Post Subject:Discussion on Mantri NavaratnaTue Nov 12, 2013 05:34 AM
Hi Friends,
They are planning the hand over of the flat is 2014 January end. But I think it is not possible. Because so many works are pending. It may be the possession is March 2014.

# mantrinavaratna   Post Subject:Discussion on Mantri NavaratnaTue Nov 12, 2013 01:56 PM
Absolutely right vkspandian4

One year of delay Great.., the compensation which they pay can't be used even for one month rental.
MANTRI now posting that they are facing problem to get the Project Completion Certificate..,
Earlier stated the STP issue for 10 months, now started with completion certification issue..,
What so ever as vkspandian4 said lot of work are to be get completed but there are no sufficient workers involved in the work..,
Without completing the ongoing project.., they starts to promote for their new projects(Money Suckers).., beware people, If you are looking flat to be delivered on time, (don't trust MANTRI, Please avoid them).




# subramanian14101983   Post Subject:Discussion on Mantri NavaratnaThu Dec 12, 2013 11:25 AM
I have received a mail from rekha stating that the work work will be completed by 20 .Dec.13 . Can anyone update me the current status of the project.

# mantrinavaratna   Post Subject:Discussion on Mantri NavaratnaMon Dec 23, 2013 10:35 AM
Yes, Rekha mailed as December 20 that's correct, but there are lot of works to get completed, the lifts are not installed for many blocks, the drive way works is not yet completed, God only knows the exact date, previously she had send a mail stating possession would be from November 15.

Jeyakanan told the project will get completed by Feburary.., it is sure that they will complete by March, then only they will allow for possession, after that they might work on the amenities what they have mentioned.

# vkspandian4   Post Subject:Discussion on Mantri NavaratnaSat Jan 11, 2014 07:42 AM
No chance for the possession in february. I think The possession is April or May. Because Mr. jeyakannan told to me, the possession is february last or march begining. But it is not sure. More over lots of work pending like, children play area, basket ball post, jogging trail, lawn, Interior works for ' I ' block,. So It may be the possession is April or May

# subramanian14101983   Post Subject:NoneSat Jan 18, 2014 07:46 AM
Thanks for your updates. Is there any group created for Mantri Navaratna if so can you pls post the link to become member .

I have booked flat in H Block

# senthilraj.surya   Post Subject:Discussion on Mantri NavaratnaMon Jan 27, 2014 03:36 AM
Thanks for all your wonderful review.

I was just thinking to buy a apartment in Mantri Navaratna by going over their website..really the website looks very cool and it gave an impression that they are doing a quality work...but after reading all your reviews i feels that the quality and the promise shown at their website are fake.....Once again thanks for all reviewers for their unconditional review.


# vkspandian4   Post Subject:Discussion on Mantri NavaratnaMon Feb 24, 2014 04:38 AM
An interesting information in Mantri navaratna. One of the flat owner in 'A' Block, fight with the people. So they complete the full work and hand over the flat for him. Now he stays in the same flat.

# subramanian14101983   Post Subject:Discussion on Mantri NavaratnaWed Feb 26, 2014 07:36 AM
Hai Vks pandian

Thanks for the update ..

Are they planning to give any compensation for the delay . Have any one created group for mantra navarathna



# sheela.nithy   Post Subject:Discussion on Mantri NavaratnaThu Mar 06, 2014 09:24 AM
Does mantri promised for any compensation for the long delay??
does any one know the reason for delay in receiving occupation certificate ?

Is it true that few flats were handed over?

# amiteshbabu   Post Subject:Discussion on Mantri NavaratnaSun Mar 09, 2014 03:05 AM
Vks pandian as you said some one staying in A block???are you sure?Can you tell the apartment number pls.

# amiteshbabu   Post Subject:Discussion on Mantri NavaratnaSun Mar 09, 2014 03:13 AM
Why don't we create our own blog to discuss about mantri???It group mails...there was a litigation in the land and recently they cleared the litigation. That's the major delay for completion completion of projects..CMDA is not given CC for this issue only... Mantri will handover flat by this month end...I hope no one so far staying in mantri navarstna..

# amiteshbabu   Post Subject:Discussion on Mantri NavaratnaSun Mar 09, 2014 03:37 AM
Hello gudmorming every body.. Today morning a few customers to meet 11am at mantri to discuss further action to get our apartments.. All are welcome...we all can call the media and share our difficulties...

# amiteshbabu   Post Subject:Discussion on Mantri NavaratnaSun Mar 09, 2014 04:56 AM
Vks pandian as you said some one staying in A block???are you sure?Can you tell the apartment number pls.

# subramanian14101983   Post Subject:Discussion on Mantri NavaratnaSat Mar 15, 2014 04:59 AM
Hai amiteshbabu

Can you pls update us the meeting .

# sheela.nithy   Post Subject:Discussion on Mantri NavaratnaWed Mar 26, 2014 08:03 AM
I was recently updated by Jeyakannan that the handover is again postponed to May ! I really wonder if they have any plans to handover the flat ??!!
Can someone pls update about the meeting mentioned above ?

# seenai   Post Subject:Discussion on Mantri NavaratnaThu Mar 27, 2014 04:01 AM
A group of Customers had several meetings in this month with Mantri Navaratna Team / Management.
The handover is getting delayed too much.
We are again going to meet on this Saturday morning @ 10:00am (29.03.14). This is to get the latest update on handover status.
All are requested to join the meeting, to decide further actions collectively.

# subramanian14101983   Post Subject:Discussion on Mantri NavaratnaThu Mar 27, 2014 04:39 PM
Hai Seenai

Thanks for the update . I am residing in qatar so i cannot attend the meeting If you dont mind can you pls update us the status after the meeting .
Last-Updated by : subramanian14101983 on Thu Mar 27, 2014 04:42 PM

# chitra.boston   Post Subject:Discussion on Mantri NavaratnaSun Mar 30, 2014 05:33 AM
Hi Seenai

I am in US for a project work .so I may not be able to join can you please provide us the updates of the meeting and handover dates if any .

Regards

# SM.Vellapandi   Post Subject:Discussion on Mantri NavaratnaSun Mar 30, 2014 02:12 PM
Hi Seenai,

We were not able attend the meeting, Could you please provide the update about the meeting.

Thanks.

# mantrinavaratna   Post Subject:Discussion on Mantri NavaratnaTue Apr 01, 2014 09:45 AM
The Proposed Possession date is by the month end of June 2014, that too is doubtful. It is better to file complaint in consumer court against Mantri at this stage itself, because I heard complaints to be raised in consumer court within two years of project delay.

source:
http://www.commonfloor.com/guide/compensation-in-delay-of-possession-of-your-apartment-1913.html/comment-page-1 [commonfloor.com]


# sg.gayathri   Post Subject:Discussion on Mantri NavaratnaTue Apr 01, 2014 10:09 AM
i booked an apartment in G block in 2011 Oct promised to be handed over by Apr 2013
please clarify whether Mantri has committed any thing in the agreement regarding compensation for delay in completion, i don't think so

# mantrinavaratna   Post Subject:Discussion on Mantri NavaratnaTue Apr 01, 2014 10:26 AM
yes, compensation is mentioned in the agreement, I hope it is around just 2 Rs per/sqft, even we can't use this amount for a one month rental.(I will post later where you can find the exact point regarding the compensation in agreement)

Now there is a thought, MANTRI might give around 9% interest for the last installment paid but I am not sure on this.

# sg.gayathri   Post Subject:Discussion on Mantri NavaratnaWed Apr 02, 2014 06:10 AM
any new update regarding Mantri Navaratna project

# sudheepravi   Post Subject:Discussion on Mantri NavaratnaThu Apr 03, 2014 03:03 AM
Do any one have contact number list/emai ids of atleast a few buyers? its time to form a group.This delay is quite irritating.got mail from rekha stating that expected possession by June 10th.


Last-Updated by : sudheepravi on Thu Apr 03, 2014 03:04 AM

# seenai   Post Subject:Discussion on Mantri NavaratnaThu Apr 03, 2014 04:02 PM
Group of customers going to meet on this Sunday again, at Mantri Navaratna, at 10:30am.
Your presence will be helpfull to ensure collective steps for early possession.

# mantrinavaratna   Post Subject:Discussion on Mantri NavaratnaMon Apr 07, 2014 02:59 AM
Hi sg.gayathiri,

The details on compensation are furnished on the construction agreement in Page-8 (point 14.5) as Rs-3 per sqft of saleable area.

I am requesting all the customers to attend the customer meet which is held on every Sundays around 10 to 10:30 AM, conform this meeting through this forum before you attend.

In the Last Meeting held on April 6th(Sunday) we conclude to meet the GM named Manoj in the MANTRI SYNERGY in padur OMR road, to take further action to give the possession before June 10th.

A proposal to give a petition directly in CM cell and to observe fasting in front Taminadu Thalamai Seyalagam chennai as the final option

We need to join hands than only the possession will be achievable else MANTRI never minds n this issue.
Last-Updated by : mantrinavaratna on Mon Apr 07, 2014 06:40 AM

# sg.gayathri   Post Subject:Discussion on Mantri NavaratnaMon Apr 07, 2014 05:16 PM
thanks for your update and information, will the meeting be held on coming sunday (13.04.2014), if so i will attend it at Mantri (chrompet)

# mantrinavaratna   Post Subject:Discussion on Mantri NavaratnaTue Apr 08, 2014 04:39 AM
I will confirm about meeting and keep you posted on or before this Friday.

# sg.gayathri   Post Subject:Discussion on Mantri NavaratnaFri Apr 11, 2014 04:35 PM
whether the meeting will be held tommorrow , if so please update the status, as i will travelling outside chennai officially, i will try to attend the next meeting

# chitra.boston   Post Subject:Discussion on Mantri NavaratnaThu Apr 17, 2014 02:42 PM
Dear friends

May I know the latest information from mantri .since I am out of country please update me the status

Regards

# mantrinavaratna   Post Subject:Discussion on Mantri NavaratnaThu Apr 24, 2014 08:14 AM
Hi all,

Unable to post the update for last couple of weeks because I am sick, this weekend on Sunday(APR 27) there is an customer meet around 10 AM @ chromepet, the agenda of the meeting is to issue a legal notice against Mantri, for this customers needs to come forward and join hands and all the customer needs to sign on the legal notice for the further proceedings.

I requesting all the customers to come in person and do the needful to get the possession as soon as possible.

# mantrinavaratna   Post Subject:Discussion on Mantri NavaratnaWed Apr 30, 2014 12:49 PM
Update on Last Meeting held on (April 27)

We have drafted a letter for Mantri particularly on the compensation part

1. Rs 3/Sqft as per the agreement.
2. As per agreement last 10% of amount to be paid at the time of possession, but they demand and collected the 10% at the time of registration, hence for that particular 10% of amount we asked to pay the interest.
3. Due to long delay we asked them to pay the compensation based on the monthly rental.

the letter have been drafted and 50 members are signed on this, we request lot more to come and sign on the letter, (the meeting will held on every Sunday by 10:20 AM @ Mantrin Navaratna Chromepet).

People like to join in the customer google group can enroll their mail id's by following the below step:





Step 1 : Copy the below URL in a notepad and replace "XXXX@XXX.com" with your email address

http://groups.google.com/group/mantri-navaratna-residents/boxsubscribe?email=XXXX@XXX.com [groups.google.com]

Step 2 : Once you have updated the above URL with your email id,copy the updated URL and paste it in the IE browser and hit enter

Step 3 : A Confirmation email for the subscription will come to your mailbox. Login to your email and hit the "Join the group button".

Once the above three steps are complete, request will go to the group moderator and once the moderator accepts your invitation,you will be part of the Mantri-navaratna-residents group id.

Pass on this to other customers who wish to join our group.

# mantrinavaratna   Post Subject:Discussion on Mantri NavaratnaMon May 05, 2014 04:53 AM
This weekend the meeting is going to held by 10th May(Saturday) @ Mantri Navaratna chrompet, because to meet the GM Manoj to put forward the grievance.

1. Mainly we focused on getting the possession as earlier as possible.
2. To discuss about water choking in drive way and also in terrace.
3. Individual flat owners to address their issues in their flats(ex: lot of flats having door alignment and lock issues).
4. To get a reasonable compensation.
5. To discuss about the amenities as mentioned in agreement.

Request all customers to attend the meeting to get these things happen.

# mantrinavaratna   Post Subject:Discussion on Mantri NavaratnaThu May 15, 2014 11:59 AM
On 16/05/14 by 5:30 PM there is a meeting in Mantri Navaratana where we plan to meet the GM and to discuss about Possession, compensation and on the pending works.

All are requested to Join the Meeting.

# iamunderscore2012   Post Subject:Discussion on Mantri NavaratnaFri May 23, 2014 06:40 AM
I believe Mantri has cheated all of us, buyers of this ill-fated property. Ideally, they should have applied for Environment Clearance even defore starting contruction. Even now they don't have environment clearance. That's the start of their fraud. I have a hunch that they will not be able to hand over the property in foreseeable future. We should file an FIR with local police station.

# writetovanji   Post Subject:Discussion on Mantri NavaratnaSat Jul 05, 2014 10:39 AM
I am also the owner of Mantri Navarathna Flat. I think its time to proceed legally and try to reach through government. We should enforce Mantri to repay all the interest incurred from March 2013 and pay compensation for mental agony and cheating customers.

# writetovanji   Post Subject:Discussion on Mantri NavaratnaSat Jul 05, 2014 10:41 AM
any update after meeting Manoj? I don't think he is helpful.
Lets meet at Mantri...please schedule.

# rajunivas84   Post Subject:Discussion on Mantri NavaratnaSat Jul 19, 2014 07:33 PM
Please help to join the customer group.I am unable to join.Also is there any update on possesion date.my mail id priyasnivas@gmail.com

# gomathikumaraguru   Post Subject:Discussion on Mantri NavaratnaSat Sep 06, 2014 12:00 PM
we have also booked a flat in B block. Is there any meeting this weekend? What did they said in the last meeting about handing over the flats and compensation?


# evvprasad   Post Subject:Discussion on Mantri NavaratnaMon Sep 08, 2014 10:10 PM
Hi Dear, have also booked flat in C Block. I tried to reach Mantri CRM team reg. possession date. Looks like still they haven't get any updates. Any idea when it will be??

# tvknarayan   Post Subject:Completion CertificateWed Sep 10, 2014 11:13 AM
Hello everybody, We are in US and have been wondering whether there has been any update about completion certificate. Sorry that we are not able to be physically present there to help others who have been actively involved in talking to the Mantri office people directly.

I wonder if there is any legal problem or strong deviation in the construction. Earlier, they had to remove the extra office buiding and hence CMDA objected. But it has been many months since then. Does anybody of you know people in CMDA so that we can check??

Without official completion certificate, it will be difficult in the future for all purposes.

Many thanks,
Thiruvikraman

# gviswa.blue   Post Subject:Looking for an apartmentThu Oct 23, 2014 05:28 AM
Hello, i am looking for an additional apartment in navratna itself. Let me if anybody willing to resale. Direction: East, 2BHK/3BHK, greater than 1000sqft and less than 1200sqft

# geramkumar   Post Subject:Discussion on Mantri NavaratnaThu Oct 23, 2014 05:05 PM
gviswa.blue, This is Ramkumar, owner of a flat E406 in Navartna. 805 sqft. 2BHK.I have an idea to sell this flat. Pls Call me @ 9962519941 if you are interested.

# khatrilatha   Post Subject:Discussion on Mantri NavaratnaWed Dec 24, 2014 04:45 PM
Hi, I am looking for a 2BHK flat to buy ..if someone is selling theirs or know if there are any availabilities please email me: khatrilatha@gmail.com.

# sujasudhir   Post Subject:Looking for apartment on saleSun Feb 01, 2015 08:38 AM
Hi, I am interested to buy an apartment, if anything is available in mantra navaratna chromepet, pls let me know the details of the same....

Post your reviews/queries/comments on Mantri Navaratna project or about Chromepet locality in general and get answers from PlaceToLive.in user community.

Discuss well before you decide on your long term investment.

Login to post

(requires

Related Projects

More Projects in Chromepet..    [PlaceToLive.in]
More Recent Projects in Chennai..    [PlaceToLive.in]
More Projects by Mantri in Chennai..    [PlaceToLive.in]
 


Related :

You might also be interested in more Apartments, Semi-Independent, Independent Homes for sale in...

Chromepet

(or)

in the whole of Chennai